mirror of
https://github.com/ksyasuda/SubMiner.git
synced 2026-02-28 06:22:45 -08:00
58 lines
2.2 KiB
Markdown
58 lines
2.2 KiB
Markdown
# Agent Session: opencode-task100-dead-code-prune-20260222T033155Z-qenz
|
|
|
|
- alias: `opencode-task100-dead-code-prune`
|
|
- mission: `Execute TASK-100 dead-code prune and cleanup via writing-plans + executing-plans (no commit).`
|
|
- status: `done`
|
|
- started_utc: `2026-02-22T03:32:21Z`
|
|
- last_update_utc: `2026-02-22T04:00:41Z`
|
|
|
|
## Intent
|
|
|
|
- Load TASK-100 from Backlog MCP and capture a concrete execution plan.
|
|
- Run dead-code candidate discovery with import/export checks and safe pruning.
|
|
- Preserve behavior with regression-safe removals and gate verification.
|
|
|
|
## Planned Files
|
|
|
|
- `src/**/*.ts`
|
|
- `scripts/**/*.ts`
|
|
- `package.json`
|
|
- `docs/**/*.md`
|
|
- `docs/plans/*.md`
|
|
|
|
## Files Touched
|
|
|
|
- `docs/subagents/agents/opencode-task100-dead-code-prune-20260222T033155Z-qenz.md`
|
|
- `docs/subagents/INDEX.md`
|
|
- `docs/subagents/collaboration.md`
|
|
- `docs/plans/2026-02-22-task-100-dead-code-prune-cleanup.md`
|
|
- `docs/reports/2026-02-22-task-100-dead-code-report.md`
|
|
- `src/anki-connect.ts`
|
|
- `src/anki-integration.ts`
|
|
- `src/anki-integration/card-creation.ts`
|
|
- `src/anki-integration/ui-feedback.ts`
|
|
- `src/core/services/anki-jimaku-ipc.ts`
|
|
- `src/core/services/immersion-tracker-service.ts`
|
|
- `src/core/services/ipc-command.ts`
|
|
- `src/renderer/positioning/position-state.ts`
|
|
- `src/tokenizers/index.ts`
|
|
- `src/token-mergers/index.ts`
|
|
- `src/core/utils/index.ts`
|
|
|
|
## Assumptions
|
|
|
|
- TASK-100 scope is code/test/docs cleanup only; no feature behavior changes.
|
|
- Existing guardrails (`check:file-budgets`, runtime-cycle check, tests) are available.
|
|
- Parallel subagents can split dead-code scan and docs/report updates safely.
|
|
|
|
## Phase Log
|
|
|
|
- `2026-02-22T03:32:21Z` Session started; loaded backlog overview/TASK-100 and subagent coordination files.
|
|
- `2026-02-22T03:39:55Z` Wrote execution plan in `docs/plans/2026-02-22-task-100-dead-code-prune-cleanup.md` and started implementation.
|
|
- `2026-02-22T03:49:20Z` Parallel subagents completed dead-code candidate analysis and safe-removal shortlist.
|
|
- `2026-02-22T04:00:41Z` Completed dead-code removals + report, verified required gates, and finalized TASK-100 as Done in Backlog MCP.
|
|
|
|
## Next Step
|
|
|
|
- Finalize TASK-100 in Backlog MCP with report path and verification evidence.
|