mirror of
https://github.com/ksyasuda/SubMiner.git
synced 2026-02-27 18:22:41 -08:00
2.2 KiB
2.2 KiB
Agent Session: opencode-task100-dead-code-prune-20260222T033155Z-qenz
- alias:
opencode-task100-dead-code-prune - mission:
Execute TASK-100 dead-code prune and cleanup via writing-plans + executing-plans (no commit). - status:
done - started_utc:
2026-02-22T03:32:21Z - last_update_utc:
2026-02-22T04:00:41Z
Intent
- Load TASK-100 from Backlog MCP and capture a concrete execution plan.
- Run dead-code candidate discovery with import/export checks and safe pruning.
- Preserve behavior with regression-safe removals and gate verification.
Planned Files
src/**/*.tsscripts/**/*.tspackage.jsondocs/**/*.mddocs/plans/*.md
Files Touched
docs/subagents/agents/opencode-task100-dead-code-prune-20260222T033155Z-qenz.mddocs/subagents/INDEX.mddocs/subagents/collaboration.mddocs/plans/2026-02-22-task-100-dead-code-prune-cleanup.mddocs/reports/2026-02-22-task-100-dead-code-report.mdsrc/anki-connect.tssrc/anki-integration.tssrc/anki-integration/card-creation.tssrc/anki-integration/ui-feedback.tssrc/core/services/anki-jimaku-ipc.tssrc/core/services/immersion-tracker-service.tssrc/core/services/ipc-command.tssrc/renderer/positioning/position-state.tssrc/tokenizers/index.tssrc/token-mergers/index.tssrc/core/utils/index.ts
Assumptions
- TASK-100 scope is code/test/docs cleanup only; no feature behavior changes.
- Existing guardrails (
check:file-budgets, runtime-cycle check, tests) are available. - Parallel subagents can split dead-code scan and docs/report updates safely.
Phase Log
2026-02-22T03:32:21ZSession started; loaded backlog overview/TASK-100 and subagent coordination files.2026-02-22T03:39:55ZWrote execution plan indocs/plans/2026-02-22-task-100-dead-code-prune-cleanup.mdand started implementation.2026-02-22T03:49:20ZParallel subagents completed dead-code candidate analysis and safe-removal shortlist.2026-02-22T04:00:41ZCompleted dead-code removals + report, verified required gates, and finalized TASK-100 as Done in Backlog MCP.
Next Step
- Finalize TASK-100 in Backlog MCP with report path and verification evidence.