sudacode 2f17859b7b Document AUR install flow and add backlog planning artifacts
- Add Arch Linux `subminer-bin` install instructions to README and docs-site installation guide
- Add Hyprland troubleshooting guidance for transparency and global shortcut passthrough
- Add TASK-159..164 backlog records and skill design plans; include changelog fragment
- Apply formatting-only update to `src/release-workflow.test.ts`
2026-03-11 02:08:59 -07:00

3.0 KiB

id, title, status, assignee, created_date, updated_date, labels, dependencies, references
id title status assignee created_date updated_date labels dependencies references
TASK-164 Run maintained test gate and fix failing regressions Done
Codex
2026-03-11 08:52 2026-03-11 08:54
maintenance
testing
/home/sudacode/projects/japanese/SubMiner/package.json
/home/sudacode/projects/japanese/SubMiner/docs-site/development.md
/home/sudacode/projects/japanese/SubMiner/docs-site/architecture.md

Description

Execute the repo's maintained test verification flow, fix any regressions surfaced by those commands, and leave the requested test gate passing without disturbing unrelated in-progress work.

Acceptance Criteria

  • #1 The maintained test commands chosen for this pass are recorded in the task plan.
  • #2 Any test failures encountered in that gate are fixed in-scope with appropriate regression coverage when needed.
  • #3 The same maintained test gate passes after the fixes.
  • #4 Verification results, skips, and remaining risks are documented before handoff.

Implementation Plan

  1. Run the maintained verification gate documented for local handoff: bun run test:fast, bun run test:env, bun run build, and bun run test:smoke:dist.
  2. Stop at the first failing command, inspect the exact failure, and use a red/green loop with the smallest targeted failing test before writing any production-code fix.
  3. Re-run the targeted failing test, then the original failing command, and continue through the remaining gate.
  4. Record results, any skips, and residual risks before handoff.

Implementation Notes

Using the docs-site recommended local gate as the maintained test/build verification flow for this request.

Ran bun run test:fast at 2026-03-11 01:52 PDT: passed.

Ran bun run test:env at 2026-03-11 01:53 PDT: passed.

Ran bun run build at 2026-03-11 01:53 PDT: passed.

Ran bun run test:smoke:dist at 2026-03-11 01:53 PDT: passed.

No failing tests surfaced in the maintained gate, so no production-code or test changes were required in this pass.

Working tree still includes unrelated user edits plus the previously-applied formatting change in src/release-workflow.test.ts; this task did not add new source changes.

Final Summary

Executed the repo's maintained local verification gate from the development docs: bun run test:fast, bun run test:env, bun run build, and bun run test:smoke:dist.

Result: every command passed. No failing tests surfaced, so no additional fixes or new regression tests were required for this task.

Working tree note: existing unrelated user changes remain in place, along with the prior formatting-only change to src/release-workflow.test.ts from TASK-163. This task introduced no new code changes.