id, title, status, assignee, created_date, updated_date, labels, dependencies, references, documentation, parent_task_id, priority
| id | title | status | assignee | created_date | updated_date | labels | dependencies | references | documentation | parent_task_id | priority | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| TASK-27.4 | Split mpv-service.ts into protocol, transport, property, and facade layers | To Do |
|
2026-02-13 17:13 | 2026-02-13 21:15 |
|
|
|
|
TASK-27 | high |
Description
Split mpv-service.ts (773 LOC) into thin, testable layers without changing wire protocol behavior.
This task absorbs the scope of TASK-8 (Reduce MpvIpcClient deps interface and separate protocol from application logic). The work proceeds in two phases:
Phase A (was TASK-8): Separate protocol from application logic
- Reduce the 22-property
MpvIpcClientDepsinterface to protocol-level concerns only - Move application-level reactions (subtitle broadcast, overlay visibility sync, timing tracking) to event emitter or external listener pattern
- Make MpvIpcClient testable without mocking 22 callbacks
Phase B: Physical file split
- Create submodules for: protocol parsing/dispatch, connection lifecycle/retry, property subscriptions/state mapping
- Wire the public facade to maintain API compatibility for all existing consumers
Acceptance Criteria
- #1 MpvIpcClient deps interface reduced to protocol-level concerns only (from current 22 properties).
- #2 Application-level reactions (subtitle broadcast, overlay sync, timing) handled via event emitter or external listeners registered by main.ts.
- #3 Create submodules for protocol parsing/dispatch, connection lifecycle/retry, and property subscriptions/state mapping.
- #4 The public mpv service API (MpvClient interface) remains compatible for all existing consumers.
- #5 MpvIpcClient is testable without mocking 22 callbacks — protocol layer tests need only socket-level mocks.
- #6 Add at least one focused regression check for reconnect + property update flow.
- #7 Document expected event flow in docs/structure-roadmap.md.
Implementation Notes
TASK-8 Absorption
TASK-8 and TASK-27.4 overlapped significantly:
- TASK-8: "Separate protocol from application logic" + shrink deps interface
- TASK-27.4: "Split into protocol, transport, property, and facade layers"
TASK-27.4 is TASK-8 + physical file splitting. Running them as separate tasks would mean touching the same file twice with the same goals. Now consolidated as Phase A (interface separation) and Phase B (file split) within a single task.
TASK-8 should be marked as superseded once this task begins.
Dependency Note
Original plan listed TASK-8 as a dependency. Since TASK-8's scope is now absorbed here, the only remaining dependency is TASK-27.1 (inventory/contracts map).