Planning
Status: active
Last verified: 2026-03-13
Owner: Kyle Yasuda
Read when: the task spans multiple files, subsystems, or verification lanes
Plan Types
- Lightweight plan: small change, a few reversible steps, minimal coordination
- Execution plan: nontrivial feature/refactor/debugging effort with multiple phases or important decisions
Use a Lightweight Plan When
- one subsystem
- obvious change shape
- low risk
- easy to verify
Use an Execution Plan When
- multiple subsystems or runtimes
- architectural tradeoffs matter
- staged verification is needed
- the work should be resumable by another agent or human
Plan Location
- active design and implementation docs live in
docs/plans/ - keep names date-prefixed and task-specific
- remove or archive old plans deliberately; do not leave mystery artifacts
Plan Contents
- problem / goal
- non-goals
- file ownership or edit scope
- verification plan
- decisions made during execution